Baan Production Extractor
5 production orders parsed into 25 routing operations and 22 material lines, loading 342.95 planned hours on 9 work centers; 6 exceptions on 3 orders to fix before loading (25.25 hours have no work center).
The run time per unit is 0 h, so 0.75 h setup + 0 h run per unit x 250 pcs = 0.75 planned hours: only the setup is loaded on WC-CNC1, none of the per-unit time.
Method1Page headers are recognised from page 1 (every line above the first order header) and skipped on later pages; order header fields are read from 'Label : value' pairs.
2Routing and Estimated Materials columns come from the dashed ruler under each section's titles and are matched by title (Work Center or Work Centre, Run Time/Unit or Cycle Time, Qty per, Total Qty...).
| Severity | Production order | Reference |
|---|---|---|
| Warning | 26000419 | Op 30 |
| Error | 26000419 | Pos 30 |
| Error | 26000420 |
Baan production order report text
Routing and BOM tables (CSV and JSON) (Routing (CSV), Bill of materials (CSV), Orders, routing and BOM (JSON))
$3,000 / month, 30% to the referring partner
Read in memory for the session, never stored, never used to train a model.
Outputs are computed from your inputs and the tool's rules. Check them before you rely on them.